Advanced Manufacturing

Fuse has a deep understanding of clean environments with our advanced manufacturing projects. One of the owners of Fuse, Paul Meyer, has over 30 years of experience in the sector and has completed over 100 cleanroom projects along with other critical environmental facilities. We appreciate the complexity and critical nature of the design and enjoy the interface with the highly technical project managers who lead the projects for the owners/user groups. Fuse has developed a large client base in this area and has several staff members dedicated to the project type.

To learn more about our services, check out our portfolio of past projects or contact us today to get started on your project!

Harder Clean Room and Office

Harder Clean Room and Office | Austin, TX

Harder Mechanical is a mechanical contractor who specializes in the advanced technology sector, as does Fuse. We share many of the same clients, many of whom wish to remain confidential. Harder’s new Austin facility provides fabrication of general mechanical building components as well as specialty process & high purity components for installation at advanced manufacturing facilities. Fuse has vast design experience with these facility types & working with Harder was a natural fit.

Samsung Austin Semiconductor

Samsung Austin Semiconductor | Austin, TX

Fuse has provided design management and architectural services on an ongoing basis at Samsung Austin Semiconductor’s 300-acre campus since 2014. Including work at previous firms, Fuse leadership has overseen the design of more than $5 billion in campus improvements since 2004.

KoMiCo Technology

KoMiCo Technology | Austin, TX

KoMiCo Technology Inc.’s facility is located at the southwest corner of the intersection of I-35 and SH-45. This facility specializes in the coating and cleaning of parts for use within the semiconductor industry. The KoMiCo Expansion is meant to provide additional lab space to allow for increased capacity and productivity, as well as additional office spaces and parts storage.

More Projects

Samsung Austin Semiconductor

  • 2015 Capacity Upgrades – CA
  • 2015 Capacity Upgrades – CD
  • 2015 Capacity Upgrades – Doc Ctrl – CA
  • 2015 Safety & Quality Upgrades – CA
  • 2015 Safety & Quality Upgrades – CD
  • 2015 Safety & Quality Upgrades – Doc Ctrl – CA
  • 2015 Safety & Quality Upgrades – Doc Ctrl – CD
  • 2016 Capacity Upgrades (Phase 3) – CA
  • 2016 Capacity Upgrades (Phase 3) – CD
  • 2016 Capacity Upgrades (Phases 1 & 2) – CA
  • 2016 Capacity Upgrades (Phases 1 & 2) – CD
  • 2016 Capacity Upgrades (Phases 1 & 2) – Doc Cntrl CA
  • 2016 Capacity Upgrades (Phases 1 & 2) – Doc Cntrl CD
  • 2016 Capacity Upgrades (Phases 1 & 2) – Doc Ctrl – CA
  • 2016 Safety & Quality – CA
  • 2016 Safety & Quality – CD
  • 2016 Safety & Quality – Doc Ctrl – CA
  • 2016 Safety & Quality – Doc Ctrl – CD
  • 2016 Safety & Quality – Q1 Projects – CA
  • 2016 Safety & Quality – Q1 Projects – CD
  • 2017 Expense Projects CA
  • 2017 Expense Projects CD
  • 2017 S&Q – CA
  • 2017 S&Q – CD
  • 2017 S&Q – DOCUMENT CONTROL-CA
  • 2017 S&Q – DOCUMENT CONTROL-CD
  • 2017 Site Improvements – CA
  • 2017 Site Improvements – CD
  • 2018 Capa Up – CA
  • 2018 Capa Up – CDs
  • 2018 S&Q – Phase-2
  • 2018 S&Q – PO#1 – FAB2 Critical Chem Expansion (F218-BC02)
  • 2018 S&Q – PO#2 – CUB2 Chiller Heat Exchanger
  • 2018 S&Q – PO#3 – FAB1 NW Shipping Dock Expansion
  • 2018 S&Q – PO#4 – (Multiple) – CA
  • 2018 S&Q – PO#4 – (Multiple) – CDs
  • 2018 S&Q – PO#5 – CT2 Expansion & F1 N2 Pur Redund
  • 2018 S&Q – PO#6 – FAB2 Chemical Additions
  • 2019 Capa Up
  • 2019 GCS Projects – ICPMS Phase 2
  • 2019 Q3 Capa-Up
  • 2019 Q4 Capa-Up VMB-DTLR
  • 2019 S&Q (Multiple) – CA
  • 2019 S&Q (Multiple) – CD
  • 2020 Q1 Capa-Up (Multiple)
  • CT2X – All Phases – CA ONLY (16 months)
  • CUB Electrical Room Cooling
  • CUB1 Boiler Access Platforms – CDs
  • CUB2 Steam Line Vent Support
  • Diesel Generator Unification
  • Energy Management Audit & Life Cycle Cost Analysis – Programming
  • FAB1 Compressor #3 Replacement
  • FAB1-FAB2 Auto Chiller Valves
  • FAB1-FAB2 FFU Monitoring – Full Design
  • FAB1-FAB2 FFU Monitoring – Programming
  • FAB2 3rd Floor Office Reconfig
  • FAB2 Data Center Expansion
  • FAB2 DCS Gas Cabinet Design
  • FAB2 Particle Counter – Phase 3
  • FAB2 South Slurry Expansion
  • FAB2 Temp and RH Control Project (IMES Prime)
  • FABX Slurry Room Mods
  • FOSB Vestibule
  • Gate 4 ISO Trailer Staging
  • Hardware Innovation Center
  • IPA T-Box Addition
  • IWT Temporary Trailer Addition
  • OA Unit Sensor Redundancy
  • Secondary Substation Expansion – Phase 2
  • Secondary Substation Expansion & FAB1 H2 Expl Prev
  • Site Critical Sump Capacity Upgrades (HDR-Wilson)
  • Site LED Lighting Phase 5 & LRG
  • Site Parking Drainage
  • Site Uninterruptable Process Air & AWW Reactor Bypass
  • Site Wireless – CUB Areas – CA
  • Site Wireless – CUB Areas – Design
  • UPS Battery Room FP
  • Utility Systems Redundancy Improvements (Multiple)
  • Waste Segregation Building
  • FOM FAB1-FAB2 Cafeteria Code Study
  • FOM FAB1-FAB2 OA & TO Safety Grating
  • FOM IWT2 Filter Press Fall Prot Feas Study
  • FOME 2019 Capital – PO1 -A
  • FOME 2019 Capital – PO1 -B
  • FOME 2019 Capital – PO2 (Multiple)
  • FOME UPW Piping Structure Analysis
  • FOME UPW1 HCl Sump Modifications
  • 2019 FOME Capital Upgrades – LP-CDA Partial – PO #1B
  • CUB1-CUB2 Cond Water Pump Replacement
  • CUB2 Boiler Backup Feedwater Lift Station
  • FAB1 2022 Capacity Upgrades – Chem and Spec Gas
  • FAB1 D550 – Replace IPA
  • FAB1 Heat Gen Capacity Increase – Phase 2
  • FAB1 N2 Compressor Addition
  • FAB1 PCW Improvements
  • FAB1 P&ID Updates
  • FAB1-FAB2 2019 Capacity Upgrades (Multiple)
  • FAB1-FAB2 2020 Capacity Upgrades (Multiple)
  • FAB1-FAB2 2021 Capacity Upgrades – Phase 1 (Multiple)
  • FAB1-FAB2 2021 Capacity Upgrades – Phase 2 (Multiple)
  • FAB1-FAB2 2021 Gas Infra Tool Installations (Multiple)
  • FAB2 2021 Solvent Waste Storage – Phases 1 & 2
  • FAB2 CT-2X Blowdown
  • FAB2 GCS Chem Room EMO Panel
  • FAB2 GCS Redundancy Projects (Multiple)
  • FAB2 ICPMS Phase 4
  • FAB2 Mechanical Room Expansion
  • FAB2 OMCTS Equipment Relocation
  • FAB2 PVAC Pump Additions
  • FAB2 SiH4 P&ID Creation
  • FAB2 TO-3 Fan Replacement – 4th Fan Addition
  • FAB2 Waste Tank Room Expansion
  • FABX Heat Exchanger Modifications
  • IWT3 SiH4 P&ID Creation
  • Site-Wide 5G Wireless Upgrades
  • Site-Wide HVAC I&C Winterization Design
  • Site-Wide Incoming Utility Improvements
  • Site-Wide Stormwater Improvements
  • Wafer Granulator Building Addition
  • Wafer Granulator Building Expansion

Applied Materials – Austin, Texas

  • B30 Upgrades – PHASE 1
  • B30 Upgrades – PHASE 2
  • B34 Pinnacles Design
  • CHiP Semiconductor – Site Masterplan
  • CHiP Semiconductor – Office Warehouse Phase I
  • CHiP Semiconductor – Office Warehouse Phase II
  • Daikin Fluorination – IMES Prime
  • DKC – Cerilliant Clean Room
  • DKC – MET 15
  • Finisar Sherman – Phase 1 – AACE
  • B30 Cleanroom Conversion
  • B31 Cleanroom Conversion
  • B31 Legal Space Fitup – Phases 1 & 2
  • B32 Cleanroom and Test Bays
  • B32 Dock Expansion
  • B34 Cleanroom Relocation – Phase 1
  • B34 Cleanroom Relocation – Phase 2
  • B36 Cleanroom Receiving Area Conversion
  • B36 Electrical Room Conversion
  • B37 Metrology Cleanroom
  • B41 Lab Expansion

 

Entegris – Burnet, Texas

  • Ampule Area Refurbishment
  • Analytical Lab – Phase 2
  • Cleanroom Expansion Study
  • Fill Hallway Study Hourly
  • Maintenance Shop Conversion
  • Phase 1 Expansion
  • Phase 2 Expansion – Cleanroom and Offices
  • Chemical Code & MAQ Analysis

 

Sandia National Laboratories

  • Semiconductor Fab Building Renovations

 

KoMiCo Technology

  • Phase 1 Building Expansion
  • Phase 2 Building Expansion

 

NXP Semiconductor

  • Bulk IPA Expansion
  • Cylinder Storage Canopy
  • E2 Test Infra Upgrade
  • TEM02 Install

 

More Advanced Manufacturing Projects

  • BSA – ICU Medical – Hazard Consulting
  • Heraeus New WTS
  • Ultraclean Code Analysis
  • Harder Mechanical – Fabrication Shop & High Purity Cleanroom
  • Infineon Expansion
  • Melissa Light Industrial Development – Melissa, Texas
  • UT Austin Microelectronics Engineering Research Center (Associate Architect with Kirksey as Prime)
  • UT Austin EME Hood Replacement and Renovation
  • Cerilliant Lab Renovation